27 July 2016 Scientific planning for the VLT and VLTI
Author Affiliations +
Abstract
An observatory system like the VLT/I requires careful scientific planning for operations and future instruments. Currently the ESO optical/near-infrared facilities include four 8m telescopes, four (movable) 1.8m telescopes used exclusively for interferometry, two 4m telescopes and two survey telescopes. This system offers a large range of scientific capabilities and setting the corresponding priorities depends good community interactions. Coordinating the existing and planned instrumentation is an important aspect for strong scientific return. The current scientific priorities for the VLT and VLTI are pushing for the development of the highest angular resolution imaging and astrometry, integral field spectroscopy and multi-object spectroscopy. The ESO 4m telescopes on La Silla will be dedicated to time domain spectroscopy and exo-planet searches with highly specialized instruments. The next decade will also see a significant rise in the scientific importance of massive ground and space-based surveys. We discuss how future developments in astronomical research could shape the VLT/I evolution.
© (2016) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
B. Leibundgut, B. Leibundgut, J.-P. Berger, J.-P. Berger, } "Scientific planning for the VLT and VLTI", Proc. SPIE 9906, Ground-based and Airborne Telescopes VI, 99065D (27 July 2016); doi: 10.1117/12.2233390; https://doi.org/10.1117/12.2233390
PROCEEDINGS
7 PAGES


SHARE
RELATED CONTENT

Subaru instrumentation: today and tomorrow
Proceedings of SPIE (September 29 2004)
Overview of the ESO instrumentation programme
Proceedings of SPIE (September 23 2012)
The La Silla-Paranal (LSP) instrumentation program
Proceedings of SPIE (September 23 2012)
Large Binocular Telescope Project
Proceedings of SPIE (March 20 1997)
Instrumentation at the ESO VLT
Proceedings of SPIE (July 08 2008)

Back to Top