15 July 2016 New facilities, new challenges: the telescope and instrument operators evolution at ESO
Author Affiliations +
Abstract
Observatories and operational strategies are evolving in connection with the facilities that will be built. For those new facilities, the strategy for dealing with the telescopes, instrumentation, data-flow, reduction process and relationship with the community is more or less handled from its conception. However, for those Observatories already in place, the challenge is to adapt the processes and prepare the existing people for these changes. This talk will show detailed information about current activities, the implemented training plan, the definition of the current operational model, the involvement of the group in projects towards improving operational processes and efficiency, and what new challenges will be involved during the definition of the strategies for the new generation instruments and facilities to be installed.
© (2016) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Andres Pino Pavez, Andres Pino Pavez, Stéphane Brillant, Stéphane Brillant, Susana Cerda, Susana Cerda, Antoine Mérand, Antoine Mérand, Steffen Mieske, Steffen Mieske, Alain Smette, Alain Smette, Cristian M. Romero, Cristian M. Romero, } "New facilities, new challenges: the telescope and instrument operators evolution at ESO", Proc. SPIE 9910, Observatory Operations: Strategies, Processes, and Systems VI, 99101K (15 July 2016); doi: 10.1117/12.2231058; https://doi.org/10.1117/12.2231058
PROCEEDINGS
12 PAGES


SHARE
RELATED CONTENT

Scientific productivity and impact of large telescopes
Proceedings of SPIE (July 11 2008)
New observing concepts for ESO survey telescopes
Proceedings of SPIE (July 29 2010)
Control system of the VLT Interferometer
Proceedings of SPIE (July 23 1998)
Observatory bibliographies: current practices
Proceedings of SPIE (September 12 2012)

Back to Top