18 August 2016 E-ELT requirements flow down
Author Affiliations +
Abstract
One of the critical activities in the systems engineering scope of work is managing requirements. In line with this, E-ELT devotes a significant effort to this activity, which follows a well-established process. This involves optimally deriving requirements from the user (Top-Level Requirements) through the system Level 1 Requirements and from here down to subsystems procurement specifications.

This paper describes the process, which is illustrated with some practical examples, including in particular the role of technical budgets to derive requirements on subsystems. Also, the provisions taken for the requirements verification are discussed.
© (2016) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
J. C. Gonzalez, J. C. Gonzalez, H. Kurlandczyk, H. Kurlandczyk, C. Schmid, C. Schmid, D. Schneller, D. Schneller, } "E-ELT requirements flow down", Proc. SPIE 9911, Modeling, Systems Engineering, and Project Management for Astronomy VI, 99110I (18 August 2016); doi: 10.1117/12.2232736; https://doi.org/10.1117/12.2232736
PROCEEDINGS
13 PAGES


SHARE
Back to Top